At a glance
| Where in Kodo | Vessel, Systems (equipment register, critical equipment, running hours, import); the Maintenance plan; Standard jobs; Plant and today; Class (annual report and the surveyor's review); each machine's History; Yard projects. |
|---|---|
| Who changes the plan | The chief engineer, the master, or someone the chief engineer authorises. Everyone else is refused. |
| Report to class | An annual report with changes, overhaul records and trends, fingerprinted and recorded as sent. |
| Class approval | Not obtained. A deliberate gap that waits for a later decision; Kodo assumes the boat is on continuous survey. |
| Status of the 14 rows below | 12 Met, 1 Partly met (backups), 1 Not met (deliberate: class approval). |
What the statuses mean: Met, Partly met and Not met describe how far the Kodo app supports each requirement, as documented and checked by the app's own automated tests. They are not a certification of Kodo, and they do not confirm that any yacht meets the rules. The flag, class and the yacht's own audits decide that.
How to read the tables
Met means the app does what the clause asks and an automated check, run against the demo yachts without changing any record, proves it. Partly met means some of it is done and the missing part is named. Not met means Kodo does not do it, either by a deliberate decision or because it is outside what software can do, and the row says which. Requirements are paraphrased, never quoted at length. The paragraph numbers follow Kodo's own reading of UR Z20.
IACS UR Z20: Planned Maintenance Scheme for Machinery
| Clause | What it asks | Where in Kodo | How Kodo handles it | Status |
|---|---|---|---|---|
| 2.1.2, 2.3.1 (approval) | Class approves the scheme and its computer system; a certificate of approval is issued and kept on board. | Compliance, Approvals and acceptances. | Not obtained. The approvals register records each approval as a separate, proven record, and it says Kodo has none. | Not met (deliberate) |
| 2.2 | The scheme is documented: an equipment list, a way to identify each machine, a maintenance sheet for each machine, and the maker's instructions on board. | Vessel, Systems; Standard jobs; Equipment tags. | The equipment register holds system, unit and component, one code per entry in service, the shipyard tag, the class item and the class code. An entry with history is retired, never deleted. Standard jobs have versions written once and steps with limits, and each job card is pinned to the version it was issued with. Each machine can have a printed QR tag. | Met |
| 1.2.1 | Intervals are no longer than those of continuous machinery survey, though running-hours intervals may be longer where the maker recommends. | Maintenance plan. | A job can repeat by days, calendar months, running hours, whichever comes first, or by uses, from a fixed or floating date. All running hours go through one record of readings: a lower, impossible or repeated reading goes to review and moves nothing until someone decides it, and a meter change keeps the lifetime hours. | Met |
| 1.3.2, 2.2.2 (records of work) | Overhauls, maintenance, repairs and renewals are recorded, and overhaul records are signed by the chief engineer. | The job panel; each machine's History. | As for ISM 10.2.4: a job is marked done only through the completion step, never by editing it directly; who did it and who signed it are kept apart; critical, class and statutory jobs need a second person's approval, never the person who did or signed it; every signature is kept with what it covered; a done job is corrected by an amendment that keeps the original. | Met |
| 2.2.1(vi), 2.2.1(vii), 2.2.2(iii) (condition) | Condition monitoring equipment, baseline data, and the condition monitoring data kept since the machine was last opened. | The register's condition; Running hours; each machine's History, Condition. | Each change of condition is kept with who and when. Fluid samples are recorded with each result against its limits, the lab's verdict and report, and a decision by the chief engineer or master, with a trend for each result. A reading that must come from a calibrated instrument names it, and one from an instrument out of calibration is refused. Baselines are not a separate record. | Met |
| 1.3 | The chief engineer is responsible; only they or another authorised person change the programme. | Maintenance plan, Who changes the machinery plan; Plant and today; Class; the import cut-over. | The database refuses adding, deleting or changing an engineering line (what, how often, how, and its standard job) unless the person is the chief engineer, the master, or someone the chief engineer has authorised on a dated register that is written once and withdrawn with a reason. Recording work and moving a due date stay open. The chief engineer also signs the cut-over from the previous system, alone records chief engineer examinations for class, and returns machines to service. | Met |
| 2.3.3 (changes to the scheme) | Changes to the scheme's documentation go into the annual report to class. | The plan line editor; Standard jobs; Class, Annual report to class. | Every plan line added, changed, paused, resumed or deleted is logged with who, when, before and after, and with its reason when one is given (the editor does not yet ask for one). Recording work on a line is not logged as a change. A plan line change carries to its open job with its reason, and every change to a job is in the audit log. A new standard job version says what changed and shows its reach before it is published. An import keeps its source files with their fingerprints and every record's old id and row. All of these go into part one of the annual report. | Met |
| 3.2.5, 3.2.6, 3.3.1 | Breakdowns documented; damage to a class item reported to class; the damaged part kept for the surveyor. | The defect's Technical record; Class. | A defect keeps its work order, verification and return to service as separate records, and a class case closes only with the society's own reference and document. The class view flags a damaged class item: report it to class, and keep the damaged part for the surveyor. | Met |
| 1.1.4, 2.3.7 (class items and credit) | Items outside the scheme are surveyed and credited in the usual way; items examined under the scheme are credited by class at the surveyor's discretion. The five-year cycle belongs to class rules, not to Z20. | Class. | A surveyor's survey is credited on the society's reference. A chief engineer's examination waits for class, and only class's recorded decision credits it or not. Renewed parts need proof they are genuine. Bottom inspections twice per cycle and no more than 36 months apart. | Met |
| 2.3.5 | Agreed intervals are not exceeded; class may cancel the arrangement. | Job, Ask to postpone; Maintenance across the fleet. | A class job's date never moves directly; postponing it needs the society's decision recorded. The office sees overdue class, statutory and critical jobs for each boat. | Met |
| 3.2.2, 3.2.4 (the surveyor's annual review) | At the annual audit the surveyor reviews the annual report and examines the performance and maintenance records. | Class, Surveyor's annual review; the annual report PDF; each machine's History (PDF, JSON, CSV); Export packs (technical handover); the logbook surveyor link. | Each review is recorded with its date, society, surveyor, outcome (satisfactory, with findings, not satisfactory), what was found, the next review due and the report reviewed, written once, by the master, the chief engineer or the office. The Class page shows the last review and the next due, in red when overdue. The surveyor examines the records through the annual report PDF, each machine's full history, the technical handover pack, and a link to the logbook that only the captain issues, limited to a date range, with a hard expiry, and revocable. A surveyor has no account of their own in Kodo. | Met |
| 2.3.3 | An annual report to class with changes, overhaul records and trend analysis. | Class, Annual report to class. | Read from the records for a period of up to two years and prepared by the master, the chief engineer, an officer or the office. Part one: changes to the scheme (plan lines with their reasons, standard job versions, imports and the cut-over, who was authorised to change the machinery plan). Part two: overhaul and maintenance records (jobs done with who did, signed and approved them, postponements and due-date moves with their reasons, defects raised and closed, returns to service, class credits). Part three: trends for each machine's running hours, use counts, round readings, fluid sample results and engine log hours (first, last, lowest, highest, average, whether it is steady, and every reading outside its limits), with the critical equipment list and its review dates. Every page of the PDF carries the app's build. The report is fingerprinted in the browser, and the report sent is recorded with its period, preparer, addressee, day sent and fingerprint, written once. | Met |
| 2.1.3 (backups) | Computer systems include back-up devices, updated at regular intervals. | Records, Offline copy on this device; Settings, The boat's archive. | The whole database, with every boat's maintenance, hours of rest and record books, is backed up every day and kept 7 days. A full restore of the database and its files into a new project was rehearsed on 19 October 2026 and reconciled table by table and file by file. On board, the record books keep a master-signed, encrypted offline copy on each device, and the boat can take its archive, with fingerprints, at any time. Missing: stored files (photos, documents) are in no regular backup, and the daily backup is held by the same provider as the live data. This becomes Met once files are backed up on a schedule to a second place. | Partly met |
| Moving from the previous system | Supporting, not a clause of its own: the record continues across systems. | Vessel, Systems, Import. | An import is staged and applied item by item. Nothing is invented, and signers from the old system are kept as text, never as Kodo signatures. A reconciliation report is produced, and the cut-over is signed by the chief engineer and approved by someone else, only on a clean reconciliation; a rollback removes nothing. Rehearsed on a synthetic sample; not yet proven on a real export. | Met |
Weaknesses to know about
- Reasons for plan changes. Every plan line change is logged with who, when, before and after, and with its reason when one is given, but the plan line editor does not yet ask for a reason.
- The surveyor's access. The surveyor's annual review is recorded and the annual report goes to class as a fingerprinted PDF, but a surveyor has no account of their own: they work from the PDF, the exports and a logbook share link.
- Moving records across. The import has been rehearsed on a synthetic export, not yet on a real one.
Related pages
- Maintenance in Kodo: the plan, rounds and defects as the crew use them.
- The ISM Code in Kodo, including section 10 on maintenance.
- How every record is kept: signatures, times and the archive.
- MARPOL record books and their offline copy.