What MLC actually requires
The Maritime Labour Convention (MLC 2006) sets minimum rest, not maximum work, and it is measured over rolling periods, not calendar days. For yacht crew on vessels where MLC applies, the numbers are:
- 10 hours of rest in any 24-hour period. Rolling, so a hard turnaround can breach it even when each calendar day looks fine.
- 77 hours of rest in any 7-day period. Also rolling: seven busy charter days in a row is where this one fails.
- No more than two rest periods a day, one of at least 6 hours, and no more than 14 hours between the end of one rest period and the start of the next.
You must keep a record for every seafarer, in the ship's working language and in English, signed every month by the master (or a person the master authorises) and by the seafarer. This is the document a flag state or port state inspector asks to see.
Where yachts actually get caught
- Back-to-back charters
- Crew with two roles, such as the deckhand who also runs the tender at midnight
- Watch rotations that drift from the plan
- Records rebuilt from memory at month-end
The fix is recording rest as it happens, against the real watch pattern.