Compliance traceability

The ISM Code, clause by clause

How the Kodo Yachts app supports a yacht's safety management system under the ISM Code: where each clause lives in Kodo, how it works, and an honest status for each one. Taken from the traceability chapter of the app's own manual.

Version 2.0.0 of the app · Updated 29 October 2026

In short: Kodo keeps the records the ISM Code asks for (risk assessments, the DPA, the master's review, familiarisation, drills, reports and corrective action, maintenance, controlled documents, audits and the DOC and SMC) and refuses the shortcuts, such as people approving their own work. All 34 rows are marked Met, with two weaknesses named below, and Kodo holds no class, flag or IMO approval.

At a glance

Rule coveredThe International Safety Management (ISM) Code, sections 1 to 14
Where in KodoCompliance (Register, Certificates, Audits, Security, Ports); Drills (Duty calendar, Reports, Controlled documents, Forms, Inspections and exercises, Changes and conflicts); Office (DPA desk, maintenance, forms); Vessel (Profile, Systems); the Maintenance plan
Status34 rows: 34 Met, 0 Partly met, 0 Not met
Weaknesses namedTwo: the risk assessment approval rule has no automated check of its own; a "photo required" task can be completed without the photo
Approvals heldNone. Kodo holds no class, flag or IMO approval of any kind.

What the statuses mean: Met, Partly met and Not met describe how far the Kodo app supports each requirement, as documented and checked by the app's own automated tests. They are not a certification of Kodo, and they do not confirm that any yacht meets the rules. The flag, class and the yacht's own audits decide that.

Clauses are paraphrased in plain words, never quoted. DPA means the Designated Person Ashore; SMS means the safety management system.

ISM Code

ClauseWhat it asksWhere in KodoHow Kodo handles itStatus
1.2.2.2Assess identified risks to ships, people and the environment; set safeguards.Safety, Risk assessments; job cards; permits; Changes and conflicts.Each risk assessment holds the hazards, people at risk, likelihood and severity before and after controls, and a review date. The master approves it, and editing an approved assessment clears the approval. Superseded assessments are archived, never deleted. A job card that needs its risk assessment cannot be finished until the assessment is confirmed read. A change opens a review with technical, security and training parts. The master's review counts assessments past their review date.Met
1.2.3.1Comply with mandatory rules.Vessel, Profile ("What applies"); Duty calendar; Certificates this boat needs.The yacht's facts are dated with their evidence and never overwritten. Each duty is answered as applicable, not applicable (with why), conditional, or unresolved (with what is missing); nobody can mark a duty set by law as "does not apply". The duty calendar turns them into recurring duties and shows what is owed and not set up. The certificate register lists what the yacht needs.Met
1.2.3.2Take account of the codes, guidelines and standards recommended by IMO, flags, class societies and industry bodies.Vessel, Profile, Rule changes; Changes and conflicts.Each duty rule carries its authority level (law, flag, class, company or Kodo) and its source. Rule versions are kept as published, and each yacht adopts a change after seeing its impact. Conflicting sources are set side by side and decided by the DPA or the office, with a reason.Met
3The Company: who is responsible; resources and shore support.Settings, "The companies behind each boat"; Office, DPA desk.Kodo holds the ISM Company with its DOC number, dated, one at a time. Outsourced crewing, technical management or DPA services are each recorded with a named person in the company who oversees them, which is required.Met
4The Designated Person: appointed, with direct access to the highest level of management.Settings, Appointments; Office, DPA desk.DPA and deputy DPA appointments are dated and never deleted; an outside DPA needs written acceptance. Kodo refuses an escalation route to top management that runs inside the purchasing chain, and keeps each test of reaching the DPA. Certificate alerts reach the DPA, and only the DPA checks that corrective action worked.Met
5.1 (including 5.1.5)The master's responsibilities, including reviewing the SMS periodically and reporting deficiencies to shore.Compliance, Audits, the master's review.Only the master starts and signs the master's review. Kodo fills in the period's facts as they were: audits, deficiencies, near misses, drills, overdue maintenance, rest breach days, crew changes, risk assessments past review, permits, and on-board complaints by state (never a confidential one to a head of department). The master writes conclusions point by point and signs; the office answers each point.Met
5.2The master's overriding authority.Next operation; Rest tab; Safety.Kodo never makes the master's decision. The next operation list has no score and no conclusion; the master records the decision under their own name, after confirming their sign-in, written once, and it can be as short as "Go". Only the master suspends the rest schedule, approves the muster list, records rest exceptions and classifies travel to join.Met
6.1, 6.2A qualified master briefed on the SMS; qualified, certificated, medically fit crew; each ship appropriately manned.Crew, Joining and clearance; Controlled documents (master briefings); Safe manning card.Someone other than the crew member reviews each certificate for rank, the yacht's limits and the flag's recognition; it is accepted only when all hold and it is in date. Lapsed or unaccepted basic safety training blocks clearance. A new master's briefing is recorded with its topics, questions and the understanding shown. The safe manning card compares the manning document with the crew cleared for duty.Met
6.3Familiarisation with duties before they start.Joining and clearance.A joiner stays at "familiarisation pending" and cannot be cleared for duty until familiarisation is recorded; life-saving appliance and fire training fall due within two weeks. A watch refuses anyone not cleared. Required open items on the joining checklist also block clearance.Met
6.4, 6.5Crew understand the SMS; training needs identified and met.Controlled documents; Your training; Crew training and refreshers.Received, understood (confirmed by another person) and practically competent are three separate records; reading a document never completes the other two. Training records carry refresher dates and the flag's acceptance.Met
7Plans, instructions and checklists for key shipboard operations.Operations (Key checks); Safety (permits, isolations, enclosed spaces); Logbook (Passages, Bridge: steering test, watch handover).Key checks are built from the yacht's own register; an operation does not close while a key check is neither ticked nor recorded as not done, with the risk and who was told. Shared isolations are released only when nothing linked is open, contractors are cleared, and enclosed-space permits need a current assessment. Approved passage plans are kept as versions with chart correction evidence. The steering test is timed against the actual departure. The incoming officer acknowledges the watch handover once.Met
8.1Identify potential emergencies and set procedures to respond.Emergency page; Muster tab; Emergency pack.Emergency contacts (rescue coordination centre, telemedical advice, flag, class, P&I and others) each carry how often they are checked and show "check due since" when overdue; a change replaces a contact and keeps the old one. The master approves the muster list only once every crew member aboard has a station, and a list changed since approval is flagged. The emergency pack holds only the procedures in force for ISM section 8, kept on the device for use offline.Met
8.2Programmes for drills and exercises.Drills (Record drill, each person's monthly drills, Duty calendar, Change the schedule).Each drill records when, the scenario, position, equipment, faults and every crew member by name as present, absent or excused; signed details stay as signed. A drill not held is recorded with why and the catch-up plan. Each person's monthly fire and abandon ship drills come from attendance only. The schedule can be tightened freely; loosening it needs a recorded reason.Met
8.2 with SOLAS III/19.3.2Crew change: drills within 24 hours of leaving port when more than a quarter of the crew have not drilled aboard in the previous month.Drills, Crew change and sailing.Kodo shows the sum with the crew count it used: if more than a quarter of the sailing crew lack both drills in the month before sailing, both are due within 24 hours of leaving. The answer is kept as given.Met
8.3The company can respond at any time to hazards, accidents and emergencies.Inspections and exercises (shore response); Office, DPA desk.Each call in a call-tree exercise is recorded with when it was answered, or that it was not reached, against the target time. The annual call-tree exercise is a duty. Tests of reaching the DPA are kept.Met
9.1Non-conformities, accidents and hazardous situations reported to the company, investigated and analysed.Drills, Reports; "Raise as a report" on a defect.Reports are numbered per company per year, linked to their source, triaged, and carry any outside authority's deadline. Confidential reporting keeps the reporter's name from the rest of the crew. A defect becomes a report in one tap. Causes stay hypotheses until there is evidence. Near misses are reported from the app.Met
9.2Corrective action, including measures to prevent recurrence.Reports.Each report runs through containment, correction, cause, prevention and effectiveness, each closed with its evidence. Only the DPA checks effectiveness, after the rest are closed, and closes the report; it can be reopened. No action can be dated past the authority's deadline. A recurring finding links the earlier reports (never merged); the DPA can mark it systemic with an evidence period and cannot close it before that period ends. The audit package lists every action and decision.Met
9 with flag rulesReporting to the flag within the flag's time limits.Reports, authority report; Compliance, Audits ("Reporting to the flag").Some flags' rules are built in: Cayman's 24-hour clocks, Malta's 30-day report after a detention, the Marshall Islands' notice to flag and class. For any other flag, the company's safety managers or DPA enter their flag's rules (the event, the hours, to whom, the source), seen only by that company and its yachts, and a report can only name one of those rules. The master or DPA records the decision and what was sent, late or not.Met
10.1Maintenance in line with the rules and the company's requirements.Maintenance plan; Safety equipment.Plan lines repeat by days, calendar months, running hours, whichever comes first, uses, coverage, after use or a failed test, or before an operation. A job tied to a rule stays on its anniversary, so a late completion never moves it. The statutory safety equipment library puts 41 tasks on the plan as fixed lines, and a service provider's job closes only with an authorised provider and certified technician on the work date and the provider's report.Met
10.2.1Inspections at appropriate intervals.Rounds; Inspections and exercises.Every checkpoint on a round needs its reading or result, with the limits kept as they stood; an out-of-limits reading becomes a job on that machine, due today. The master's weekly inspections are recorded.Met
10.2.2Any non-conformity reported, with its possible cause if known.Issues (defects) with the technical record; Reports.Defects carry a technical state beside their status and the machine they are on. A defect can be raised as a report, with causes kept as hypotheses.Met
10.2.3Appropriate corrective action.The technical record on each defect.Separate records: the work order; verification by someone other than the repairer (written once); return to service by the chief engineer or master only, never the office; operating restrictions lifted only on purpose, with a reason; class, flag and port State cases closed only with the authority's own reference and document. Verifying, returning to service, lifting and closing each ask the person to confirm their sign-in.Met
10.2.4Records of these activities are kept.The job panel; machine history.A job is marked done only through the completion step, never by editing it directly. Who did it and who signed it are kept apart, and critical, class and statutory jobs need approval by a further person who neither did nor signed them. A done job is corrected only by an amendment that keeps the original; it is never deleted. Each machine has its whole history in one place.Met
10.2 (postponement)Supporting: overdue or deferred work is controlled.Job, Ask to postpone; the office's maintenance view.A postponement is routed by where the deadline comes from (statutory and class jobs go to the office or master, with the society's or flag's decision) and is never approved by the person asking. The original due date is kept beside the new one.Met
10.3Identify equipment whose sudden failure could be hazardous; measures for reliability, including tests of standby equipment.Vessel, Systems, Critical equipment; Maintenance plan, Change this line.Any machine can be marked critical, with for what and why (both required), the failure consequence, compensating measures, redundancy group, minimum available, longest time out of service, and the standby test procedure and acceptance criteria. A lost unit is never called adequate, and short critical spares are shown. Each critical machine has its standby test on the plan (how often, next due, last done, its state) or a recorded reason it needs none, and the critical equipment review is refused until every critical machine has one or the other. Only the chief engineer, the master or someone authorised adds the test line.Met
10.4Inspections and tests integrated into routine maintenance.Rounds; Tasks, Maintenance due.Rounds and the plan sit together. Routine checks due today can be signed in one go, but never a job with a job card, a rule, a class item or a critical machine behind it.Met
11.1, 11.2.1, 11.2.2Control documents and data; valid documents where needed; changes reviewed and approved by authorised people.Drills, Controlled documents; Office forms.The document register holds each document's number, manual section, the ISM sections it answers, owner, approver and who must read it. A proposed revision leaves the current one in force until the named approver, never the proposer, approves it; issuing directly is refused. Each revision keeps its own file and fingerprint, a controlled document's file changes only with a new revision, and a document with history is never deleted. Office forms are kept by revision.Met
11.2.3Obsolete documents promptly removed.Controlled documents; the Emergency page's offline copy.An approved revision makes the one before it obsolete, kept for audits only. The emergency pack on the device drops superseded revisions at the next online read. A form filled offline on a superseded revision is kept and flagged, never rewritten.Met
12.1Internal audits on board and ashore at intervals of no more than 12 months (a 3-month extension in exceptional cases).Compliance, Audits.Kodo refuses an audit date more than 12 months after the last unless an extension of at most 3 months is recorded with its reason and approval (on the Marshall Islands, the flag's prior approval reference). A remote routine audit is not counted as done without the flag's acceptance.Met
12.2Verify periodically that the tasks the company delegates under the ISM Code are carried out.Compliance, Audits ("Tasks the company delegates").Each delegated ISM task is recorded with to whom, its ISM section, since when and how often it is verified (1 to 36 months). Each verification is written once (the day, carried out or not, what was checked); the next falls due from the last, and an overdue one is marked. Only the company's safety managers and its DPA see them.Met
12.3Periodically evaluate the effectiveness of the SMS.Compliance, Audits, management review.The management review keeps every yacht's facts as they were, minutes with who attended, and actions with named owners and dates.Met
12.5Auditors independent of the area audited, unless impracticable for the size of the company or ship.Compliance, Audits.An auditor who belongs to the yacht (or, for an office audit, the office's managers and DPA) makes it a self-audit: Kodo flags it, it needs a reason, and another person in the office must approve it before it is done.Met
12.6, 12.7Results brought to the people responsible; timely corrective action.Audits; Reports; DPA desk.Findings carry a grade, ISM section, owner (the area's head by default) and due date, and close with evidence. The DPA's queue shows whose move each open report is waiting on, and since when.Met
13, 14DOC and SMC certification and verification, including endorsement (13.13) and extension (13.14) of an SMC; interim certificates (14).Certificates this boat needs.Kodo refuses an interim DOC longer than 12 months, an interim SMC longer than 6, and one interim after another. An ISM 13.13 endorsement (up to 5 months) or 13.14 extension (up to 3 months) is recorded with the authority's reference. A withdrawn DOC ceases every SMC on the company's yachts.Met

Weaknesses to know about

  • Risk assessments (1.2.2.2): the rule that clears an approval when an approved assessment is edited has no automated database check of its own yet. Only the job card's "risk assessment read" step is checked.
  • Evidence of work on tasks (section 10): a task marked "photo required" asks for the photo on the completion sheet, but the database does not enforce it, and a task already begun can be completed without one. A completed task can also be set back to pending; only the change history records it.

Every gap across all the rule areas is listed on the compliance overview.

Questions

Does Kodo decide whether the yacht is safe to sail?

No. Kodo never makes the master's decision. The next operation list has no score and no conclusion; the master records the decision under their own name, written once, and it can be as short as "Go".

Who closes a corrective action in Kodo?

The Designated Person Ashore. Each report runs through containment, correction, cause, prevention and effectiveness, each closed with its evidence. Only the DPA checks that the action worked, after the other stages are closed, and only the DPA closes the report.

How does Kodo handle interim DOC and SMC certificates?

It refuses an interim DOC longer than 12 months, an interim SMC longer than 6 months, and one interim certificate following another. Endorsements and extensions are recorded with the authority's reference, and a withdrawn DOC ceases every SMC on the company's yachts.

Are there gaps in Kodo's ISM Code coverage?

All 34 ISM rows are marked Met in version 2.0.0, with two weaknesses named: the risk assessment register's approval rule has no automated check of its own yet, and a task marked "photo required" can still be completed without the photo. Kodo holds no class, flag or IMO approval.