The yacht SMS audit checklist

The difference between a real safety management system and paperwork for show appears in twenty minutes of honest checking. This is that twenty minutes, written down: tick it as if the surveyor were already aboard.

In short: a yacht SMS self-audit checks four areas in about twenty minutes: drills; people and paper (DPA, certificates, controlled documents); risk assessments and permits; and the learning loop of incidents, corrective actions and safety meetings. Anything you cannot show in writing counts as not done, because that is how a surveyor will treat it.

Jordon Booth, founder of Kodo Yachts and ex-yacht crew · Updated October 2026

Would your SMS survive an inspector today?

Every commercially operated yacht runs some form of safety management system. Work through this list as if the surveyor were aboard; anything you cannot show in writing, treat as not done, because that is how the inspector will treat it.

Print it, tick it on screen, or hand it to the mate. Intervals vary by flag, code and your own SMS, so where yours differ, use yours.

Drills

  • Fire drill held within the last month, logged with attendees and lessons
  • Abandon ship drill held within the last month
  • Man overboard drill held within the interval your SMS sets
  • Longer-cycle drills in date: emergency steering, enclosed space rescue, security
  • Every drill logged where an inspector can read it, with the deficiencies it exposed

People and paper

  • DPA name and 24-hour contact posted where crew can actually find them
  • Certificate register current: nothing expired, nothing inside its renewal window unnoticed
  • Crew certificates and medicals (ENG1 or equivalent) in date for every role
  • Controlled documents (SMS manuals, key procedures) at their current revision, with crew acknowledgement recorded

Risk and permits

  • Risk assessment register reviewed within its cycle, none overdue for review
  • Assessments exist for the usual suspects: tender operations, bunkering, hot work, work aloft and overside, enclosed spaces, mooring, guest watersports
  • No permit to work still open past its validity: hot work, enclosed space, aloft, overside, electrical

Learning loop

  • Every incident and near miss from the period has a corrective action recorded
  • Corrective actions closed out and verified, not just written down
  • Monthly safety meeting held, minutes signed, actions given to named people with dates
  • Actions from previous meetings actually closed, not rolling forward forever

A clean sweep here does not certify anything, and this page is practical guidance rather than legal advice. But a yacht that passes this list cold has very little to fear from the real thing.

Questions

Does a yacht under 500 GT need a safety management system?

Commercially operated yachts under most flags and codes need a documented safety management system suited to their size (a mini-ISM), even below the 500 GT threshold where the full ISM Code becomes mandatory. Private yachts are generally not required to have one, and the well-run ones keep one anyway. Check your own flag and code.

What does a surveyor actually ask for?

Evidence, not assurances: the drill log with dates and attendees, the risk assessment register with review dates, closed permits, signed safety meeting minutes, the certificate register, incident records with verified corrective actions, and the DPA details. If it is not written down, it did not happen.

How often should safety meetings happen?

Monthly is the common rhythm on well-run yachts, with minutes signed by the master and actions given to named people with due dates. The meeting matters less than the closed actions it produces.

Can this evidence be kept in software?

Yes. Kodo Yachts keeps drills, risk assessments, permits to work, safety meetings, audits and corrective actions as records the crew add to as the work happens, so the evidence a surveyor asks for already exists instead of being assembled the week before. An inspection pack brings it together for the surveyor.