The handover that survives the crew change

Most handovers happen in the last 48 hours: a rushed document, a walk-around, a voice note from the airport. Then the yacht spends a season rediscovering what it already knew. This is how to do it properly, from someone who lived the bad version.

In short: start the handover two weeks before the crew change, cover each department's open items, routines, quirks, people and honest unknowns, and sign it off against a list rather than a feeling. The handover that survives is the one the yacht has been writing all season, so the next person starts from a record instead of a rushed document.

Jordon Booth, founder of Kodo Yachts and ex-yacht crew · Updated October 2026

Why handovers fail

1. They are written by the person leaving, at the worst possible time

The leaver is packing, closing out a season and already gone in their head. The handover document is unpaid homework for someone with no stake in what happens after Friday. Even the careful ones write what is easy to write, not what is hard to know.

2. The knowledge is in people's heads, not written anywhere

The generator's warm-up quirk, which chandler actually delivers on a Sunday, how the owner takes their coffee, what got someone shouted at in June. None of it lives in a document, because none of it ever felt like a document's job.

3. The reader does not know what to ask

A handover answers the questions the writer thought of. The new crew member's real questions only surface weeks later, mid-problem, when the person with the answer is on another boat with a new phone number.

What a real handover contains

By department, the things that actually hurt when they are missing. Use it as an audit list against your current handover document.

Engineering

  • The quirks: everything the manuals do not say, machine by machine
  • Open defects, and the history of past fixes with what actually worked
  • Spares aboard, spares on order, and which suppliers answer in August
  • Where the service schedule stands: what is due, what is overdue, what has been deferred and why

Deck

  • Berth and marina notes: approaches, contacts, which berths to refuse
  • Tender quirks, fuel arrangements, launch routines
  • Wash-down, covers and stowage logic that keeps the yacht looking right
  • Where the season stands: what is ashore, what is aboard, what is broken

Interior

  • Owner and guest preferences: the coffee, the allergies, the cabin setup, the things never to do
  • Provisioning suppliers by port, with the honest notes
  • Laundry, stowage and setup logic another stew could follow cold
  • Inventory levels and what needs replacing before the next trip

Bridge and admin

  • Certificates and surveys with expiry dates, and where the documents live
  • Where drills and safety equipment servicing stand
  • The contact list that actually works: agent, chandler, engineer ashore, the owner's office
  • Account logins: kept in a password manager, never in the handover document itself

Two weeks, not two days

WhenWhat to do
Two weeks outStart the document and share it early. A rough draft the incoming person can read before arriving beats a polished one handed over at the gangway. Questions asked in advance are the cheapest questions.
Overlap daysShadow, don't tour. If you get an overlap, spend it doing the actual jobs together: a full machinery round, a provisioning run, a guest cabin setup. The quirks only surface when the machines are running.
Final daySign off against a list, not a feeling. Walk the audit list above and mark what is handed over, what is documented and what is honestly unknown. The unknowns matter most: they are the next person's watch list.
AfterLeave a channel open for 30 days. One agreed month of "text me if something is on fire" costs the leaver little and saves the yacht weeks. Put it in writing so it is a courtesy, not a haunting.

The template structure

One page per department, in this order:

  1. Read this first: the five things that will bite in week one
  2. Open items: defects, orders and unfinished work, each with its history
  3. The routines: daily, weekly, before guests and after guests
  4. The quirks: everything the manuals and checklists do not say
  5. People: who to call, for what, and who to avoid
  6. The unknowns: what the leaver honestly cannot answer

The uncomfortable truth: a handover written in the last week was always going to lose. The best handover is the one the yacht has been writing all season.

That is the idea Kodo Yachts is built on. When the crew run their day in one place (tasks, defects, operations, guest notes), the handover stops being a document someone writes in a hurry and becomes a record the next person starts from. Briefings are built from what the yacht already knows and signed by both people. The crew handover page shows what an incoming crew member sees on day one.